
| Course Code | : CE423 |
| Course Type | : Area Elective |
| Couse Group | : First Cycle (Bachelor's Degree) |
| Education Language | : English |
| Work Placement | : N/A |
| Theory | : 3 |
| Prt. | : 0 |
| Credit | : 3 |
| Lab | : 0 |
| ECTS | : 5 |
To gain the knowledge intakes structure from the rivers by diversion weirs, and gated diversion weirs. To be able to design and construction of spillways, sluiceways, stilling basins and energy dissipation basins.
Design of side-wise water intake structures/Design of the diversion weir/ Design of the gated diversion weir/ Stilling basin/Energy dissipation basins/ Seepage controlling/ Hydraulics of Cross drainage structures/ Bridge and culvert hydraulics
| 1. | Water intake structure design |
| 2. | Settling basement design |
| 3. | Regulator and infiltration structures design |
| 4. | Energy dissipiation structures design |
| 5. | Project plots |
| 1. | Water-Resources Engineering, Linsley, Franzini, Freyberg, Tchobonglous, 1992 |
| Type of Assessment | Count | Percent |
|---|---|---|
| Attending Lectures | 1 | %5 |
| Project | 1 | %60 |
| Verbal Examination | 1 | %10 |
| Final Examination | 1 | %25 |
| Activities | Count | Preparation | Time | Total Work Load (hours) |
|---|---|---|---|---|
| Lecture - Theory | 14 | 0 | 3 | 42 |
| Project | 1 | 65 | 2 | 67 |
| Final Examination | 1 | 14 | 2 | 16 |
| TOTAL WORKLOAD (hours) | 125 | |||
PÇ-1 | PÇ-2 | PÇ-3 | PÇ-4 | PÇ-5 | PÇ-6 | PÇ-7 | PÇ-8 | PÇ-9 | PÇ-10 | PÇ-11 | |
OÇ-1 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 5 |
OÇ-2 | 5 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 |
OÇ-3 | 5 | 5 | 4 | 5 | 5 | 4 | 5 | 4 | 5 | 4 | 5 |
OÇ-4 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 |
OÇ-5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 | 5 | 4 |