
| Course Code | : CE430 |
| Course Type | : Area Elective |
| Couse Group | : First Cycle (Bachelor's Degree) |
| Education Language | : English |
| Work Placement | : N/A |
| Theory | : 3 |
| Prt. | : 0 |
| Credit | : 3 |
| Lab | : 0 |
| ECTS | : 5 |
Control of groundwater in areas such as parks and gardens, and hydraulic planning and design of structures in rainwater drainage and urban areas, as well as removal of surface runoff without giving any damage to the environment, removal of water leaking from the ground safely without harming the building and basic system.
Rainfall and calculation of surface runoff, design principles of rainwater sewerage construction, subsurface drainage planning and design principles, hydraulical dimensioning of river passages
| 1. | Basic information about drainage techniques |
| 2. | Solutions for surface runoff |
| 3. | Solutions for storm channels |
| 4. | Criterions of drainage design |
| 5. | Solutions for manholes |
| 1. | Water Resources Engineering, David Chin, 3rd Ed., PEARSON |
| 2. | Urban Hydraulics and Hydrology, Ali Günyaktı, Nobel. |
| Type of Assessment | Count | Percent |
|---|---|---|
| Attending Lectures | 1 | %5 |
| Quiz | 1 | %15 |
| Midterm Examination | 1 | %30 |
| Final Examination | 1 | %50 |
| Activities | Count | Preparation | Time | Total Work Load (hours) |
|---|---|---|---|---|
| Lecture - Theory | 14 | 0 | 3 | 42 |
| Quiz | 1 | 15 | 1 | 16 |
| Midterm Examination | 1 | 23 | 2 | 25 |
| Final Examination | 1 | 40 | 2 | 42 |
| TOTAL WORKLOAD (hours) | 125 | |||
PÇ-1 | PÇ-2 | PÇ-3 | PÇ-4 | PÇ-5 | PÇ-6 | PÇ-7 | PÇ-8 | PÇ-9 | PÇ-10 | PÇ-11 | |
OÇ-1 | 4 | 4 | 4 | ||||||||
OÇ-2 | 4 | 4 | 4 | 4 | |||||||
OÇ-3 | 4 | 4 | 4 | 4 | |||||||
OÇ-4 | 5 | ||||||||||
OÇ-5 | 3 | 3 | |||||||||